On July 12, 2026, Singapore marked a major milestone in its public transportation journey with the opening of Stage 6 of the Circle Line (CCL), closing the loop between HarbourFront and Marina Bay stations. This final segment introduced three new stations: Keppel (CC30), Cantonment (CC31), and Prince Edward Road (CC32), seamlessly connecting the entire 39-kilometer, 33-station Circle Line.
The completion of the Circle Line enhances connectivity across the city, promising significant benefits to over 10,000 commuters daily. With the new direct rail link, some travel times will be shortened by up to 10 minutes, bringing more convenience to those navigating Singapore’s extensive MRT network.
Each of the new stations reflects the character and heritage of its surroundings:
– **Keppel Station** stands out as the only Circle Line station with underground bicycle parking, offering 312 lots. Situated 20 meters underground, its design pays homage to the industrial legacy of the nearby port area, creating a unique and functional transit hub.
– **Cantonment Station** draws from the rich history near the conserved Tanjong Pagar Railway Station. As a gateway to the Tanjong Pagar Distripark, it connects commuters to cultural landmarks including the Singapore Art Museum and other galleries, integrating heritage with modern transit.
– **Prince Edward Road Station** is located on the outer fringes of Shenton Way within the Central Business District. Its ship hull-inspired design beautifully reflects Singapore’s maritime heritage, blending the city’s economic history with its forward-looking infrastructure.
The Circle Line’s completion exemplifies Singapore’s dedication to expanding and modernizing its public transportation system. This milestone not only improves commuter experience but also demonstrates the city-state’s commitment to sustainable urban mobility, ensuring residents and visitors enjoy faster, more efficient travel across the island.

Leave a Reply